NC Contractor License Guide homeNC Contractor License Guide

North Carolina Electrical License Requirements and Classifications

North Carolina issues an electrical contracting license in three classifications set by project value — Limited, Intermediate and Unlimited — and, unlike general contracting, each sets a maximum number of experience hours the Board may require. The individual qualifying the license must be at least 18, show good character, and pass an examination covering the National Electrical Code as adopted in this state.

The value ceilings are much lower than the general contractor tiers, and reading one board’s figures as the other’s is the common error.

The three classifications, in the statute’s words

G.S. 87-43.3(a) sets them out together:

(a) An electrical contracting license shall be issued in one of the following classifications: (1) Limited, under which a licensee shall be permitted to engage in a single electrical contracting project of a value, as established by the Board, not in excess of one hundred thousand dollars ($100,000) and on which the equipment or installation in the contract is rated at not more than 1,000 volts. The limited classification and any special restricted classifications shall require no more than 3,000 hours of experience, of which, no less than 2,000 hours shall consist of primary experience gained by direct installation of electrical wiring and equipment governed by the National Electric Code. (2) Intermediate, under which a licensee shall be permitted to engage in a single electrical contracting project of a value, as established by the Board, not in excess of two hundred thousand dollars ($200,000). The intermediate classification shall require no more than 5,750 hours of experience, of which, no less than 5,000 hours shall consist of primary experience gained by direct installation of electrical wiring and equipment governed by the National Electric Code. (3) Unlimited, under which a licensee shall be permitted to engage in any electrical contracting project regardless of value. The unlimited classification shall require no more than 9,000 hours of experience, of which, no less than 8,000 hours shall consist of primary experience gained by direct installation of electrical wiring and equipment governed by the National Electric Code.

Limited also carries a voltage condition that the other two do not: the equipment or installation in the contract must be “rated at not more than 1,000 volts” (G.S. 87-43.3(a)(1)). It is the only classification whose limit is expressed in anything other than money.

Reading the hours correctly

The statute says each classification “shall require no more than” a number of hours (G.S. 87-43.3(a)). That phrasing is a ceiling on what the Board may demand, not a floor the applicant must reach. What the Board actually requires sits within it, and G.S. 87-42 gives the Board the power to “prescribe the standards of knowledge, experience and proficiency to be required of qualified individuals, which may vary for the various license classifications.”

Within each ceiling, a proportion is reserved. For the Limited classification, “no less than 2,000 hours shall consist of primary experience gained by direct installation of electrical wiring and equipment governed by the National Electric Code”; the Intermediate figure is 5,000 and the Unlimited figure 8,000 (G.S. 87-43.3(a)).

Primary experience is defined by what the work is — the statute ties it to direct installation of wiring and equipment governed by the National Electric Code. How those hours are accumulated is a separate question. What decides whether a given job counts is the definition, not the route taken to it.

Set up the entity that will hold the electrical license

An electrical contracting license is issued to a person, partnership, firm or corporation — and under G.S. 87-41.1 a firm qualifies by regularly employing at least one listed qualified individual. The annual fee is charged for each principal and each branch place of business. These services handle entity formation, with registered-agent service where offered.

We may earn a commission from these partners. See our Affiliate Disclosure.

The examination, and who may sit it

G.S. 87-42 sets the threshold and the subject matter:

Applicants for certification as a qualified individual must be at least 18 years of age and shall be required to demonstrate to the satisfaction of the Board their good character and adequate technical and practical knowledge concerning the safe and proper installation of electrical work and equipment. The examination to be given for this purpose shall include, but not be limited to, the appropriate provisions of the National Electrical Code as incorporated in the North Carolina State Building Code, the analysis of electrical plans and specifications, estimating of electrical installations, and the fundamentals of the installation of electrical work and equipment.

That phrase — shall include, but not be limited to — is doing real work. The four subjects named are a floor, not a syllabus, and the examination can cover more than the four subjects named (G.S. 87-42).

Certification is issued in the same classifications as the licenses — G.S. 87-42 provides that “Certification of qualified individuals shall be issued in the same classifications as provided in this Article for license classifications.” You are certified Limited, Intermediate or Unlimited, matching the license the certification can qualify.

What it costs, and why no figure here is the price

G.S. 87-44 states the fees as maxima rather than amounts:

The Board shall collect a fee from each applicant before granting or renewing a license under the provisions of this Article; the annual license fee for the limited classification shall not exceed one hundred dollars ($100.00) for each principal and each branch place of business; the annual license fee for the intermediate classification shall not exceed one hundred fifty dollars ($150.00) for each principal and each branch place of business; the annual license fee for the unlimited classification shall not exceed two hundred dollars ($200.00) for each principal and each branch place of business; and the annual license fee for the special restricted classifications and for the single-family detached residential dwelling license shall not exceed one hundred dollars ($100.00) for each principal and each branch place of business.

Those are ceilings the Board may not exceed, not the charge. The amount actually payable is set by the Board and should be read from the Board, not from this page or from the statute. Two details in that passage are flat facts rather than caps: the fee attaches per place of business, principal and branch alike, and under G.S. 87-44 licenses “expire one year after the date of issuance” rather than on a common date.

Against the general contractor requirements

The contrast is sharp enough to be worth stating plainly, because a reader who has read the general contractor pages will carry the wrong model across.

Where the two statutes meet on a single project is at how electrical work sits against a contractor license, and the standards behind all of this are set by the board that sets the standards. For the licensing system as a whole, start at the main licensing guide.

General information, not legal advice — for your own license or dispute, ask someone qualified. This site is not affiliated with the North Carolina Licensing Board for General Contractors, or with any other State board that licenses a trade. Fees and deadlines change; last checked 2026-10-05.